Asphalt
The final step in road construction is laying asphalt, to provide a smooth driving surface for vehicles.
Complete
Earthworks
The topsoil is removed and stored for later use. The land is shaped to lot designs and for drainage to Melbourne Water standards.
Complete
Foothpaths, Topsoil & Seeding
Concrete footpaths are constructed to provide safe pedestrian access to each lot. Topsoil is placed in the nature strips and seeded.
Complete
Power & Telecommunications
Power, internet and phone services are installed, ready for connection to each home. Street lighting is also installed.
Complete
Retaining Walls
Where required, retaining walls are constructed to manage surface level changes and provide suitable lots for house construction.
Complete